NATIONAL HIRE NUMBER

Icing on the cake



As a gesture that always seem to go down a treat, Lynch have been sending personalised dual branded cup cakes to site. One such site visit in Oxfordshire was to Fastflow, working on behalf of National Grid to replace an existing pipe line through Oxfordshire.

Lynch supplied a variety of machines both Operated and Self Drive, with operators completing the SHEA Gas Certificate accreditation as per National Grid legislation. Garry Cross (left) made the visit and presented Colum (Fastflow Project Manager) with our dual branded cakes for his continued support on this project.